Mira vigour User's Guide Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
19
COMMISSIONING
The unit must not be run dry. Before proceeding any further with the installation the
shower unit must be commissioned.
1. Connect the exible hose to the outlet
of the shower unit.
Caution! Do not over tighten.
2. Turn on the water supplies and check
for leaks.
3. Switch on the electrical supply.
4. Turn the outer flow control
anticlockwise to full ow.
5. Rotate the inner temperature control
anticlockwise to check the hot supply
and clockwise to check the cold
supply.
6. Turn the outer ow control clockwise
to the OFF position.
7. The shower unit is now
commissioned.
Inner
Temperature
Control
Temperature Indicator
CoolerWarmer
Outer Flow Control
Maximum
Flow Position
Outer Flow Control
Off Position
Hose Washer
Hose
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 27 28

Comments to this Manuals

No comments