Mira Escape User's Guide Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
14
Commissioning
Turn control to full cold. Turn the water supply
fully on.
Check for water leaks. Set control to ‘I’. S w i t c h o n e le c t r i c a l
supply.
Press the Start/Stop
button, light on the button
comes on
Water will be at full force and
at a cool temperature.
Turn the control slowly.
Temperature remains cool
and ow is reduced
Electrical supply is turned
off at the mains.
0 - 5 Secs
1.
4.
3.2.
6.5.
9.8.7.
Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
If you are unsure how an electric shower works, please read through the section
“User Instructions” before continuing.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 31 32

Comments to this Manuals

No comments